top of page

PROJECTS

EL CORTIJO WIND FARM

ACCIONA México

Period: 2017.

Starting point: General Escobedo, Nuevo Leon.

Destination: "El Cortijo" Wind Farm, Reynosa, Tam.

 

DPH participated in the construction of El Cortijo Wind Farm with the manufacturing of concrete keystones. This process includes steel bending, concrete preparation and curing, finishing and storage up until transportation of element to the Park that has 61 WTGs with a total capacity of 183MW.

​

Concrete keystone oscillate between 18-20m long and can weigh up to 120ton. TPH Transportadora was in charge of moving them in a 250km journey from the manufacturing plant to the Wind Farm in Tamaulipas.

bottom of page